Structural work on Basement floors 1, 2 and 3 of Tower A of
The Peak Towers is complete, along with all foundations. The lift core
structure of Tower A is now complete up to the 2nd residential
floor.
In Tower B, foundation works are 80% complete. Concrete
slab work on the basement of Tower B is 30% complete. The lift core
structure of Tower B is now complete up to the 2nd residential
floor.